Generally speaking, the stage lighting needs to be installed after the new addition, so some suppliers are not equipped with technical personnel to assist in the installation, so how should the user install the stage lighting and put it into use? Next, we Shenzhen Liyang Performance Equipment Co., Ltd. will tell you about it.
The first step: turn on the beam light for aviation inventory and acceptance
When the equipment arrives at the site according to the supply plan stipulated in the contract, the general contractor, the owner (or its representative), the supervisor and the supplier shall work together to check the machinery and equipment one by one according to the equipment packing list and equipment technical documents. , registration and inspection, and important parts and components must be inspected, accepted and handed over according to the specified quality standards.
The third step: basic size (light positioning size)
According to the equipment layout plan and the axis or elevation line of the relevant building, the installation reference line is delineated. The stage mechanical engineering is an associated project of multiple or multiple equipments. The equipments that are connected or arranged with each other should be set with a common installation reference line and elevation line. If necessary, general or permanent reference points should be buried to set the basic position line. and base line. Due to the corresponding relationship between the equipment on the stage and the equipment under the stage, the basic axis of the stage plane should also be drawn on the top plane of the grid and the plane of each warehouse.
The third step: equipment lighting inspection
The foundation construction unit shall provide the equipment foundation quality certificate for inspection. If necessary, the strength of the foundation can be re-measured, and the appearance of the foundation can be inspected, mainly to check whether the surface of the foundation has honeycomb, pockmarked, uneven uneven defects. Measure and check the elevation, position, and geometric dimensions of the foundation, and check the coordinate position, the elevation and center distance of the embedded parts, the anchor bolts or the anchor plate of the anchor bolts, and the distance between the embedded anchor bolt holes (if any). Center position, depth, etc.
The fourth step: equipment lighting in place
For equipment with heavy weight, large volume or high installation position, it is necessary to focus on solving the problem of hoisting. For equipment that is disassembled or installed in large pieces, it is necessary to ensure that key components such as the equipment base, rack and guide rails are in place, and then assemble other parts. For the stage with the main lifting platform, auxiliary lifting platform, car platform, and vehicle turntable under the stage, from the determination of the basic axis to the installation of the equipment, we must pay close attention to the relevance of the equipment.
Step 5: Accuracy detection and adjustment. Accuracy detection and adjustment are the key procedures in equipment installation. All position accuracy items and some shape accuracy items belong to this scope. The work involves error analysis, the principle of dimension chain and precision measurement technology, which is an important process to ensure the quality of installation. Accuracy detection is to detect the relative position error between equipment parts, such as perpendicularity, parallelism, coaxiality error, etc. When adjusting, adjust the position status of the equipment itself and each other according to the technical requirements of equipment installation (specified by specifications or design technical documents) and the results of precision testing, such as the installation level, verticality, parallelism, etc. of the equipment.
Step 6: Fix the lighting equipment
Except for a few movable equipment, all mechanical equipment must be firmly fixed on the equipment foundation to prevent the occurrence of major accidents caused by not being firmly fixed.
Step 7: Disassembly, packing and assembly
For disassembled mechanical equipment parts and equipment parts that have been stored for too long and have exceeded the rust-proof shelf life, they should be disassembled, cleaned and reassembled. This type of situation is uncommon in new theatres and will increase over time after regular testing of the equipment.
The eighth step: equipment maintenance and lubrication
Fill each lubricating point with oil according to the type and quantity of lubricant specified in the design.
The ninth step: equipment debugging
(1) Debugging of a single device. Its contents mainly include: verification of initial position of equipment, verification of design speed (or speed range), adjustment of motion limit range (stroke and travel switch), verification of load (rated load and overload), adjustment of safety device (switch or circuit), etc. .
(2) Debugging of related group equipment. Its contents mainly include: group motion forms (associative motion, non-associative motion, etc.), group motion safety control (interlock conditions, synchronization errors, scene parameters, speed errors, etc.), etc. The debugging of the equipment is inseparable from the debugging of the control system. Generally, most of the control performance debugging is achieved through the debugging of the equipment performance, and the debugging of the control system comes first, and the debugging of the equipment comes after. Make records of equipment debugging for archiving.
The tenth step: carry out the purchase of lamps and lanterns with the company
Shenzhen Liyang Performance Equipment Co., Ltd. is a stage lighting equipment manufacturer that has been engaged in many years. The quality of the lighting is guaranteed, and there are professional talents to teach you how to buy lamps, not rounds, beam lights, par lights, follow spot lights, laser lights, A series of lighting equipment such as computer lights and power distribution cabinets are debugged to meet the requirements of new customers.